Effective solution
Quick and easy installation
The advantage of this mast is that its construction can be carried out within a few days, thanks to the foundation design solution. The foundations are above ground, so only the surface of the ground needs to be prepared for their construction. This significantly saves time, as there is no need to dig a construction pit and perform foundation concreting work.